Sabotage suspected – freight prepare locomotive derails in Essen | EUROtoday
According to the investigative authorities, after the derailment of a freight prepare locomotive in Essen as a consequence of an hooked up steel half, there may be presently neither a suspect nor a letter of accountability. German army circles stated that army transports additionally ran alongside the route. However, circles acquainted with the method additionally defined to the dpa information company that there aren’t any commonplace routes for army transport and that the routes of those trains are totally different. There was no concrete details about the perpetrators and their motivation.
The Essen public prosecutor’s workplace assumes {that a} felony offense has occurred. She is investigating harmful interference with rail visitors, a spokesman stated. “We are investigating in all directions.” The investigation is in an early part and there’s no suspect. No one was injured within the incident on Monday night.
According to the police, no confession letter has been acquired within the case up to now. A spokesman confirmed {that a} steel half had been hooked up to the monitor by unknown individuals. According to earlier stories, the locomotive derailed and got here to a cease after a number of hundred meters. The wagons remained undamaged. According to the police, the freight prepare was carrying hazardous substances. State safety can also be concerned within the investigation.
https://www.welt.de/vermischtes/article696aac996b40895ba7f7080b/sabotage-vermutet-gueterzuglok-entgleist-in-essen.html