workers attempt to bend administration with a purpose to preserve manufacturing in Isère | EUROtoday

Get real time updates directly on you device, subscribe now.

Portraits of Teisseire employees threatened with losing their jobs hang in front of the company's headquarters, in Crolles (Isère), on November 20, 2025.

“Thierry, thirty-six years in the manufacturing workshop”. “Nathalie, thirty-four years in the quality department”. “Pierre-Yves, fourteen years in the packaging workshop”. On the gates surrounding the Teisseire manufacturing unit, in Crolles (Isère), the portraits of the workers are displayed in black and white like so many false obituaries. These workers are among the many 205 threatened with dismissal on the positioning, which brings collectively the historic manufacturing unit and the Teisseire headquarters with round 300 workers. On October 16, the Danish group Carlsberg, proprietor of Teisseire after buying the British Britvic at the beginning of 2025, introduced a significant plan to reorganize the syrup producer’s actions.

Since this date, the Isère manufacturing unit has been at a standstill, and the workers have engaged in a standoff with administration, which briefly transferred manufacturing from Crolles to Le Havre, to its subcontractor Slaur Sardet, a significant French producer of alcoholic drinks and syrups, as a part of a enterprise continuation plan (PCA). This was overturned on the finish of December by the courts. “Our priority (…)it is the maintenance of production on the site and the maintenance of jobs”insists Florent Duc, CGT union delegate on the Crolles manufacturing unit.

You have 77.33% of this text left to learn. The relaxation is reserved for subscribers.

https://www.lemonde.fr/economie/article/2025/12/29/teisseire-les-salaries-tentent-de-faire-plier-la-direction-afin-de-maintenir-la-production-en-isere_6659741_3234.html