HSB development challenge: closures attributable to new rails for the Harzquerbahn | EUROtoday
The Harzer Schmalspurbahnen (HSB) is anticipated to resume a stage crossing on the route between Eisfelder Talmühle and Drei Annen Hohne by Wednesday. The connections on the affected Harzquerbahn between the 2 stations will likely be operated as a rail alternative service, because the railway firm based mostly in Wernigerode introduced. The development website additionally has an impression on automotive visitors, it stated. If there may be concern, the B242 is closed and a diversion has been arrange.
“With the current work we are completing what we were unable to complete last November because of the winter,” stated HSB spokesman Dirk Bahnsen. Because the rails and floor must be renewed, the HSB is counting on monitor assist plates. This precept works equally to mannequin railway development and is especially sturdy. “We have only used this at two level crossings so far,” stated Bahnsen. “These track support plates have a very long service life of up to 70 years.”
At round 140 kilometers, HSB operates the longest steady narrow-gauge community in Germany. These embrace the Brockenbahn, the Harzquerbahn and the Selketalbahn.
© dpa-infocom, dpa:260329-930-882113/1
https://www.zeit.de/news/2026-03/29/sperrungen-wegen-neuer-schienen-fuer-die-harzquerbahn