Drivers warned of 3-mile closure on UK motorway | UK | News | EUROtoday

Drivers warned of 3-mile closure on UK motorway | UK | News
 | EUROtoday

Drivers travelling between England and Wales have been warned to double-check their journey plans forward of a collection of in a single day closures for resurfacing work on the M4 Prince of Wales Bridge. National Highways will shut the motorway’s westbound stretch throughout the bridge for 4 nights on the finish of April earlier than imposing full in a single day closures on a handful of dates in early May, with contraflow anticipated to stay in place for round two months. The momentary closures of the three-mile stretch, which is the quickest solution to journey between England and Wales, will allow employees to resurface 1km of the cable-stay construction, constructed to ease stress on the Severn Bridge in 1996.

The challenge may final till the early autumn, however the staggered technique of the work has been designed to minimise disruption – with the in a single day lane closures this month laying the groundwork for the site visitors administration measures rolled out from subsequent week. National Highways mentioned the scheme would “future-proof the surfacing of the bridge and ensure it is fit for purpose for the next 20 years”, including that it might “reduce the need for further unplanned closures, which cause the most disruption to users”.

Over 30,000 autos cross the Prince of Wales Bridge, which is a part of the M4 between London and South Wales, daily.

That quantity may rise after a brand new weight restrict is launched for the M48 Severn crossing on May 27, nonetheless, after inspections confirmed deterioration of the 59-year-old route.

Heavy items autos over 7.5-tonnes should use the Prince of Wales bridge to journey between England and Wales for no less than 12 to 18 months, whereas National Highways decides on and implements a medium-term resolution.

The company has timed the upcoming collection of in a single day closures to precede the change, nonetheless, with the newer crossing’s westbound carriageway shut between 9pm and 6am for 4 nights starting on Sunday, April 27.

Full in a single day closures of each the east and westbound carriageways will then start on May 1, 2 and 6, whereas simply the eastbound route will probably be shut between the identical hours on May 7.

Motorists will probably be diverted to the Severn Bridge throughout every stint of upkeep work, with a 40mph restrict in drive from 6am on May 7 alongside contraflow measures.

https://www.express.co.uk/news/uk/2045768/drivers-warned-3-mile-closure-uk