The European investigation of the blackout factors to failures by Red Eléctrica, corporations and regulators in Spain | Economy | EUROtoday

An ideal storm attributable to a number of causes. This was what prompted the good blackout that the Iberian Peninsula skilled on April 28 of final yr. There have been failures of the electrical energy corporations, of the massive technology vegetation, of the renewables that have been unduly disconnected, of Red Eléctrica and, to this, is added an insufficient regulation that led to that nice electrical energy drop, “unprecedented”, a yr in the past, in line with the European investigation of round fifty specialists from Entso-e, the group that brings collectively electrical energy community managers in Europe.

Just three days after the blackout, Entso-e created a assume tank to seek out out what had occurred in Europe’s worst blackout in a long time. Last October they already introduced a preliminary report regretting that information from the businesses was lacking. Early this Friday they introduced a doc whose major goal is to current suggestions, 22 in whole, to enhance administration and stop an identical occasion from being repeated.

The report identifies deficiencies within the administration of the community by Red Eléctrica by declaring that the connection and disconnection of vital parts for voltage management was carried out manually, which required decision-making and processing time that was not enough given the pace of the incident. In addition, it highlights that there was no real-time supervision of the distinction between the reactive energy that the vegetation have been offering and what the operator anticipated, which prevented the danger from being recognized when the voltage approached vital ranges.

For massive electrical energy corporations (Iberdrola, Endesa and Naturgy, primarily), the evaluation reveals that the contribution of reactive energy from a number of standard mills was inadequate, fulfilling lower than 75% of the system operator’s requests in vital hours.

Renewables additionally had their share of accountability, the report states. Experts conclude that they operated with a hard and fast energy issue, which means that they didn’t react to adjustments in voltage to assist stabilize it. In addition, many disconnected routinely earlier than reaching the voltage limits allowed on the community entry factors. In this sense, just like the preliminary evaluation of Entso-E and Acer, the ultimate report reiterates the dearth of requested information. Among the data requested and never delivered was the journey voltage of the renewable vegetation that tripped improperly.

The final of the key culprits identified by the European investigation are the Spanish regulators. In vitality issues, it’s the Ministry for the Ecological Transition and the National Market and Competition Commission who’ve these powers.

The report signifies that the principles of the sport in Spain facilitated the blackout situation. On the one hand, the distinctive voltage vary of the 400 kV community in Spain operates underneath particular rules that permit a wider voltage vary than in the remainder of Europe. This left an virtually non-existent margin between the conventional working restrict and the voltage that causes the automated security disconnection of the mills.

https://elpais.com/economia/2026-03-20/la-investigacion-europea-del-apagon-apunta-a-fallos-de-red-electrica-las-empresas-y-los-reguladores-en-espana.html